Projects Archive

Three Station Robotic Welding Cell

  • One Fanuc Arc Mate 100iC/6L robot arm with R-30iA controller
  • Three-station robotic welding cell with three end to end head and tailstocks
  • Servo controlled track increases robot work envelope and allows for the robot to weld at all three stations
  • Track/weld positioner configuration optimizes cell layout which minimizes operator walk time and allows part storage and loading to be executed from one side of the welding cell
  • Custom weld tooling with pneumatic and manual clamping designed a and fabricated by Vizient
  • Three operator stations with push buttons and detached jog functionality
« back to projects archive
Three Station Robotic Welding Cell
Three Station Robotic Welding Cell
Three Station Robotic Welding Cell
Three Station Robotic Welding Cell

Vizient

3129 State St.
Bettendorf, IA
52722

Phone: (563) 355-4812
Fax: (563) 355-4817

contact us »
View Map